Sewed the front and back together of a teddy I've been knitting during my lunch break at work. Here's what he looking like prior to a trip through the washing machine.
Three wash loads later he's shorter and felted. Now he just needs stuffing and some facial construction and he'll be ready to play with.
Work on the balconies and finished the entire border. Added some flower pots with accompaning flowers and the stitching is finished for this piece. Now it needs a good pressing and then its on to the finishing.
Worked on my socks tonite also inbetween playing with my kitty helpers. Did a 2 inch ribbed cuff in the solid color and then 3 inches of stockinette in varigated yarn. A few more inches and then the heel will be turned using the solid. This is the first time I've knit a two color sock. I'm looking forward to seeing how it turns out.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment